The economy of reinforced concrete design will be fully realized only when the reinforcements are maintained at their designed position at all times. According to IS 2502-1963, bars crossing each other where required, shall be secured by binding wire (annealed) of size not less than 0.90mm, in such a manner that they will not slip over at the time of fixing and concreting. Every compression bar shall be tied at least in two perpendicular directions.


METHODS OF TYING REINFORCEMENT BARS


Quantity of binding wire depends upon the nature of reinforcement. For every 10 sq.m slabs approximately 2.7 kg of 18 gauge soft black wire is required. For other works 1 kg per quintal of steel may be recommended.