Main item %
Sub item %
Material
Sub Item
Main Item
Total
Labour
Total
Material
Labour
Foundation and Plinth
Excavation
0.03
0.27
0.30

4.35

1.35

6.20
Concrete
2.24
0.54
2.80
Brick work
1.68
0.82
2.50
D. P. Course
0.40
0.20
0.60
Walling
Brick work
8.17
4.03
12.20

9.80

4.90

6.20
RCC lintels and Chajjas etc.
1.63
0.87
2.50
Roof
Concrete slab
5.22
3.48
8.70

16.83

6.37

23.89
Reinforcement
7.76
1.94
4.70
Water proofing
3.29
1.41
4.70
R.W. pipes
0.56
0.14
0.70
Floor
Sub floor
1.58
0.52
2.10

2.84

1.36

4.26
Top finish
1.26
0.84
2.10
Joinery
Doors
4.44
2.96
7.40

9.60

6.40

16.00
Windows
5.16
3.44
8.60
Finishes


Plaster
3.48
2.32
5.80

4.11

2.89

7.00
White wash
0.30
0.40
0.70
Painting
0.33
0.17
0.50
Fitting & fixtures services
Ward-Robe
1.98
1.32
3.36

2.18

1.42

3.60
Chullah
0.20
0.10
0.30
EXTERNAL





6.45


3.15




24.50
Path
1.20
0.30
1.50
Sanitary
2.53
1.27
3.80
Water supply
0.98
0.42
1.40
Electrification
1.74
1.16
2.90
INTERNAL





9.79


5.1

Sanitary
4.92
1.68
5.60
Water supply
2.03
0.87
2.90
Electrification
3.84
2.56
6.49