Main
item %
|
Sub
item %
|
Material
|
Sub
Item
|
Main
Item
|
Total
|
||
Labour
|
Total
|
Material
|
Labour
|
||||
Foundation
and Plinth
|
Excavation
|
0.03
|
0.27
|
0.30
|
4.35
|
1.35
|
6.20
|
Concrete
|
2.24
|
0.54
|
2.80
|
||||
Brick
work
|
1.68
|
0.82
|
2.50
|
||||
D. P.
Course
|
0.40
|
0.20
|
0.60
|
||||
Walling
|
Brick
work
|
8.17
|
4.03
|
12.20
|
9.80
|
4.90
|
6.20
|
RCC
lintels and Chajjas etc.
|
1.63
|
0.87
|
2.50
|
||||
Roof
|
Concrete
slab
|
5.22
|
3.48
|
8.70
|
16.83
|
6.37
|
23.89
|
Reinforcement
|
7.76
|
1.94
|
4.70
|
||||
Water
proofing
|
3.29
|
1.41
|
4.70
|
||||
R.W.
pipes
|
0.56
|
0.14
|
0.70
|
||||
Floor
|
Sub
floor
|
1.58
|
0.52
|
2.10
|
2.84
|
1.36
|
4.26
|
Top
finish
|
1.26
|
0.84
|
2.10
|
||||
Joinery
|
Doors
|
4.44
|
2.96
|
7.40
|
9.60
|
6.40
|
16.00
|
Windows
|
5.16
|
3.44
|
8.60
|
||||
Finishes
|
Plaster
|
3.48
|
2.32
|
5.80
|
4.11
|
2.89
|
7.00
|
White
wash
|
0.30
|
0.40
|
0.70
|
||||
Painting
|
0.33
|
0.17
|
0.50
|
||||
Fitting
& fixtures services
|
Ward-Robe
|
1.98
|
1.32
|
3.36
|
2.18
|
1.42
|
3.60
|
Chullah
|
0.20
|
0.10
|
0.30
|
||||
EXTERNAL
|
6.45
|
3.15
|
24.50
|
||||
Path
|
1.20
|
0.30
|
1.50
|
||||
Sanitary
|
2.53
|
1.27
|
3.80
|
||||
Water
supply
|
0.98
|
0.42
|
1.40
|
||||
Electrification
|
1.74
|
1.16
|
2.90
|
||||
INTERNAL
|
9.79
|
5.1
|
|||||
Sanitary
|
4.92
|
1.68
|
5.60
|
||||
Water
supply
|
2.03
|
0.87
|
2.90
|
||||
Electrification
|
3.84
|
2.56
|
6.49
|