Schedule of slab

Sr.no.
Type of slab
Slab no. & location
steel
1.
One way slab

Slab no. – 1 (Store room)

Short span steel – 12 mm dia. @ 150 c/c
Long span steel – 8 mm dia. @ 200 c/c
Thickness of slab – 150 mm

2.
One way slab

Slab no. – 2 (kitchen room)

Short span steel – 10 mm dia. @ 150 c/c
Long span steel – 8 mm dia. @ 200 c/c
Thickness of slab – 150 mm

3.
One way slab

Slab no. – 3 (varandha)

Short span steel – 12 mm dia. @ 200 c/c
Long span steel – 10 mm dia. @ 225 c/c
Thickness of slab – 150 mm

4.
Two way slab

Slab no. – 4 (bed room)

Short span steel – 12 mm dia. @ 150 c/c (alternet bentup bar)
Long span steel – 16 mm dia. @ 200 c/c (alternet bentup bar)
Thickness of slab – 150 mm

5.
Two way slab

Slab no. – 5 (seating room)

Short span steel – 16 mm dia. @ 250 c/c (alternet bentup bar)
Long span steel – 20 mm dia. @ 275 c/c (alternet bentup bar)
Thickness of slab – 150 mm

6.
Two way slab

Slab no. – 6 (enterance hall)

Short span steel – 12 mm dia. @ 150 c/c (alternet bentup bar)
Long span steel – 16 mm dia. @ 200 c/c (alternet bentup bar)
Thickness of slab – 150 mm

7.
Two way slab

Slab no. – 7 (bed room)

Short span steel – 10 mm dia. @ 150 c/c (alternet bentup bar)
Long span steel – 12 mm dia. @ 150 c/c (alternet bentup bar)
Thickness of slab – 150 mm

8.
One way slab

Slab no. – 8 (w.c. & bath room)

Short span steel – 12 mm dia. @ 150 c/c (alternate bent up bar)
Long span steel – 12 mm dia. @ 150 c/c (distribution bar)
Thickness of slab – 150 mm





Slab quantity

Slab no. – 1 (Store room)

One way slab
Short span steel – 12 mm dia. @ 150 c/c
Long span steel – 8 mm dia. @ 200 c/c
Thickness of slab – 150 mm

Long span 12 mm dia. (alternate bent up)
10d + L + 0.42d + L/4
= 10 (12mm) + 2.2 + 0.42 (0.15) + 2.5/4
= 0.12 + 2.2 + 0.063 + 0.625
= 3.008 meter

No. of bar = length of one bar / c/c distance between the bars
No. of bar = 3 /150 mm
No. of bar = 3 / 0.150 meter
No of bar = 20 add one bar extra
No of bar = i.e 21

Therefor, total length of 12 mm dia. Of bar = 3.008 x 21 = 63.16 meter
(50% deduction of due to alternate bent up bar )
therefore, 63.16/2 = 31.58 meter

short span 8 mm dia. (distribution bar)
No. of bar = length of one bar / c/c distance between the bars
No. of bar = 2.2/0.2
No. of bar = 11 add one bar extra
No. of bar = i.e. 12

8 mm dia. bar = length of one bar x 12 no. of bar
8 mm dia. bar  = 3 x 12

8 mm dia. bar = 36 meter


Slab quantity

Slab no. – 2 (kitchen room)

One way slab
Short span steel – 10 mm dia. @ 150 c/c
Long span steel – 8 mm dia. @ 200 c/c
Thickness of slab – 150 mm

Long span 8 mm dia. (straight bar)
No. of bar = length of one bar / c/c distance between the bars
No. of bar = 2.5/0.2
No. of bar = 12.5 say 13 add one bar extra
No. of bar = i.e. 14

8 mm dia. bar = length of one bar x 14 no. of bar
8 mm dia. bar  = 3 x 14
8 mm dia. bar = 42 meter

short span 10 mm dia. @ 150 c/c (distribution bar)

10d + L + 0.42d + L/4
= 10 (10mm) + 2.5 + 0.42 (0.15) + 5.70/4
= 0.1 + 2.5 + 0.063 + 1.425
= 4.088 meter

No. of bar = length of one bar / c/c distance between the bars
No. of bar = 3/0.150
No. of bar = 20 add one bar extra
No. of bar = i.e. 21

Therefore, total length of 10 mm dia. bar = 4.088 x 21 = 85.84 meter


Slab quantity

Slab no. – 3 (verandha)

One way slab
Short span steel – 12 mm dia. @ 200 c/c
Long span steel – 10 mm dia. @ 225 c/c
Thickness of slab – 150 mm

Long span 10 mm dia. @ 225 c/c (distribution bar)
No. of bar = length of one bar / c/c distance between the bars
No. of bar = 2.5/0.225
No. of bar = 11.11 say 12 add one bar extra
No. of bar = i.e. 13

10 mm dia. bar = length of one bar x 13 no. of bar
10 mm dia. bar  = 5.70 x 13
10 mm dia. bar = 74.1meter

short span 12 mm dia. @ 200 c/c (alternate bar up bar)

10d + L + 0.42d + L/4
= 10 (12mm) + 2.5 + 0.42 (0.15) + 4.10/4
= 0.12 + 2.5 + 0.063 + 1.025
= 3.708 meter

No. of bar = length of one bar / c/c distance between the bars
No. of bar = 5.70/0.200
No. of bar = 28.5 say 29 add one bar extra
No. of bar = i.e. 30

Therefore, total length of 12 mm dia. bar = 3.708 x 30 = 111.24 meter



Slab quantity

Slab no. – 4 (bed room)

Two way slab
Short span steel – 12 mm dia. @ 150 c/c (alternet bentup bar)
Long span steel – 16 mm dia. @ 200 c/c (alternet bentup bar)
Thickness of slab – 150 mm

Long span steel – 16 mm dia. @ 200 c/c (alternet bentup bar)

10d + L + 0.42d + L/4 + L/4
= 10 (16mm) + 3.6 + 0.42 (0.15) + 3/4 + 2/4
= 0.16 + 3.6 + 0.063 + 0.75 + 0.5
= 5.073 meter

No. of bar = length of one bar / c/c distance between the bars
No. of bar = 3.6/0.150
No. of bar = 24 add one bar extra
No. of bar = i.e. 25

Therefore, total length of 16 mm dia. bar = 5.073 x 25 = 126.825 meter

Short span steel – 12 mm dia. @ 150 c/c (alternet bentup bar)
10d + L + 0.42d + L/4
= 10 (12mm) + 5 + 0.42 (0.15) + 5.70/4
= 0.12 + 5 + 0.063 + 1.425
= 6.608 meter

No. of bar = length of one bar / c/c distance between the bars
No. of bar = 5/0.200
No. of bar = 25 add one bar extra
No. of bar = i.e 26
Therefore, length of 12 mm dia. bar = 6.608 x 26 = 171.80 meter


Slab quantity

Slab no. – 5 (seating room)

Two way slab
Short span steel – 16 mm dia. @ 250 c/c (alternet bentup bar)
Long span steel – 20 mm dia. @ 275 c/c (alternet bentup bar)
Thickness of slab – 150 mm

Long span steel – 20 mm dia. @ 275 c/c (alternet bentup bar)

10d + L + 0.42d + L/4
= 10 (20mm) + 5.70 + 0.42 (0.15) + 5/4
= 0.20 + 5.70 + 0.063 + 0.75 + 1.25
= 7.213 meter

No. of bar = length of one bar / c/c distance between the bars
No. of bar = 4.10/0.275
No. of bar = 14.90 say 15 add one bar extra
No. of bar = i.e. 16

Therefore, total length of 20 mm dia. bar = 7.213 x 16 = 115.40 meter

Short span steel – 16 mm dia. @ 250 c/c (alternet bentup bar)

10d + L + 0.42d + L/4 + L/4
= 10 (16mm) + 4.10 + 0.42 (0.15) + 2.50/4 + 3.00/4
= 0.16 + 4.10 + 0.063 + 0.625 + 0.75
= 5.698 meter

No. of bar = length of one bar / c/c distance between the bars
No. of bar = 5.70/0.250
No. of bar = 22.8 say 23 add one bar extra
No. of bar = i.e 24
Therefore, length of 16 mm dia. bar = 5.698 x 24 = 136.75 meter


Slab quantity

Slab no. – 6 (enterance hall)

Two way slab
Short span steel – 12 mm dia. @ 150 c/c (alternet bentup bar)
Long span steel – 16 mm dia. @ 200 c/c (alternet bentup bar)
Thickness of slab – 150 mm

Long span steel – 16 mm dia. @ 200 c/c (alternet bentup bar)

10d + L + 0.42d + L/4
= 10 (16mm) + 4.2 + 0.42 (0.15) + 3.60/4
= 0.16 + 4.2 + 0.063 + 0.9
= 5.323 meter

No. of bar = length of one bar / c/c distance between the bars
No. of bar = 3/0.200
No. of bar = 15 add one bar extra
No. of bar = i.e. 16

Therefore, total length of 16 mm dia. bar = 5.323 x 16 = 85.16 meter

Short span steel – 12 mm dia. @ 150 c/c (alternet bentup bar)

10d + L + 0.42d + L/4
= 10 (12mm) + 3 + 0.42 (0.15) + 4.10/4
= 0.12 + 3 + 0.063 + 1.025
= 4.208 meter

No. of bar = length of one bar / c/c distance between the bars
No. of bar = 4.208/0.150
No. of bar = 28 add one bar extra
No. of bar = i.e 29
Therefore, length of 12 mm dia. bar = 4.208 x 29 = 122.03 meter


Slab quantity

Slab no. – 7 (bed room)

Two way slab
Short span steel – 10 mm dia. @ 150 c/c (alternet bentup bar)
Long span steel – 12 mm dia. @ 150 c/c (alternet bentup bar)
Thickness of slab – 150 mm

Long span steel – 12 mm dia. @ 150 c/c (alternet bentup bar)

10d + L + 0.42d + L/4
= 10 (12mm) + 5 + 0.42 (0.15) + 3.60/4
= 0.12 + 5 + 0.063 + 0.9
= 6.083 meter

No. of bar = length of one bar / c/c distance between the bars
No. of bar = 3.60/0.150
No. of bar = 24 add one bar extra
No. of bar = i.e. 25

Therefore, total length of 12 mm dia. bar = 6.083 x 25 = 152.07 meter

Short span steel – 10 mm dia. @ 150 c/c (alternet bentup bar)

10d + L + 0.42d + L/4
= 10 (10mm) + 3.6 + 0.42 (0.15) + 4.20/4
= 0.12 + 3.6 + 0.063 + 1.05
= 4.813 meter

No. of bar = length of one bar / c/c distance between the bars
No. of bar = 5/0.150
No. of bar = 33.33 say 34 add one bar extra
No. of bar = i.e 35
Therefore, length of 10 mm dia. bar = 4.813 x 35 = 168.45 meter


Slab quantity

Slab no. – 8 (w.c. & bath room)

One way slab
Short span steel – 12 mm dia. @ 150 c/c (alternate bent up bar)
Long span steel – 12 mm dia. @ 150 c/c (distribution bar)
Thickness of slab – 150 mm

Long span steel – 12 mm dia. @ 150 c/c (distribution bar)
No. of bar = length of one bar / c/c distance between the bars
No. of bar = 2/0.150
No. of bar = 13.33 say 14 add one bar extra
No. of bar = i.e. 15

Therefore, total length of 12 mm dia. bar = 2.6 x 15 = 39 meter

Short span steel – 12 mm dia. @ 150 c/c (alternate bent up bar)

10d + L + 0.42d + L/4
= 10 (12mm) + 2 + 0.42 (0.15) + 3.60/4
= 0.12 + 2 + 0.063 + 0.9
= 3.083 meter

No. of bar = length of one bar / c/c distance between the bars
No. of bar = 2.6/0.150
No. of bar = 17.33 say 18 add one bar extra
No. of bar = i.e 19
Therefore, length of 10 mm dia. bar = 3.083 x 19 = 58.577 meter