Sr. No.
Checklist
Remarks
a.     
PMV mobilization plan.
System to be design & Implemented.
b.    
Log Book / Records of Equipments.
c.     
Record of mobilization of resources.
d.    
Checklist of daily maintenance records.
e.     
Monthly status records.
f.      
Transfer of equipments records.
g.     
Demobilization dates in mobilization plan.
h.    
List of PMV deployed at site
A.      
Earth Work
1)       
Excavator
2)      
Tippers
B.      
Tower Crane
C.      
Concreting Equipments
1)       
Builders Hoist
2)      
Curing Pump
3)      
Vibrators
D.     
Reinforcement Steel
1)       
Bar Bending Machine
2)      
Bar Shearing Machine
E.      
Lab Equipments
1)       
Compression Testing Machine (100 MT / 200 MT)
2)      
Electric Oven
3)      
Vibrating Table
4)      
Sieve Shaker  
5)      
Sieve Sets 
6)      
Concrete Cube Moulds
7)      
Cement Cube Moulds
8)     
Electronic Weighting Machine
9)      
Weighting Machine
10)  
Bimetallic Thermometer
F.      
Survey Equipments





System to be design & Implemented.
1)       
Theodolite
2)      
Leveling Machine 
3)      
Total Station
G.     
General
1)       
Jeep
2)      
LCV
H.     
Diesel Generators

1)       
125 / 75 KVA
2)      
25 KVA
I.        
Electrically Operated Instruments