SHALIMAR GROUP
|
NAME OF THE DEPARTMENT :
|
DOCUMENT CODE NO.
| |||||||||||||
EXECUTION
| |||||||||||||||
NAME OF THE DOCUMENT :
|
PAGE NO.
|
TOTAL PAGES.
| |||||||||||||
CHECKLIST FOR BUILDING LAYOUT
|
0
|
1
|
0
|
1
| |||||||||||
CHECKLIST FOR BUILDING LAYOUT
| |||||||||||||||
Sr. No:
| |||||||||||||||
SITE : SHALIMAR ANTHURIUM
|
LOCATION :
|
DATE :
| |||||||||||||
Ref. Drawing No. ________________________________________
| |||||||||||||||
Sr. No.
|
Job Description
|
YES
|
NO
|
NA
| |||||||||||
1.
|
Overall Dimensions
| ||||||||||||||
2.
|
All Angles
| ||||||||||||||
3.
|
Centre line distance
| ||||||||||||||
4.
|
Diagonals
| ||||||||||||||
5.
|
Distance from Benchmark
| ||||||||||||||
6.
|
Pillars or side railings which should have centre lines marked/ painted.
| ||||||||||||||
7.
|
Level Pillars transferred from benchmark.
| ||||||||||||||
8.
|
Lineout for footings to ensure to size, working space & orientation
| ||||||||||||||
9.
|
Open Space from building. Face to boundry wall.
| ||||||||||||||
SIGN. OF SITE ENGINEER
| |||||||||||||||
CORRECTIVE ACTION PROPOSED
| |||||||||||||||
Sign of Project Manager Sign of Project Manager
Contractor Shalimar Group
|