CHECKLIST FORMAT FOR BUILDING LAYOUT





SHALIMAR GROUP
NAME OF THE DEPARTMENT :
DOCUMENT CODE NO.
EXECUTION






NAME OF THE DOCUMENT :
PAGE NO.
TOTAL PAGES.
CHECKLIST FOR BUILDING LAYOUT

0
1

0
1
CHECKLIST FOR BUILDING LAYOUT

Sr. No:




SITE : SHALIMAR ANTHURIUM
LOCATION :
DATE :
Ref. Drawing No. ________________________________________
Sr. No.
Job Description
YES
NO
NA
1.
Overall Dimensions



2.
All Angles



3.
Centre line distance



4.
Diagonals



5.
Distance from Benchmark



6.
Pillars or side railings which should have centre lines marked/ painted.



7.
Level Pillars transferred from benchmark.



8.
Lineout for footings to ensure to size, working space & orientation



9.
Open Space from building. Face to boundry wall.



                                                                                          

                                                                                          SIGN. OF SITE ENGINEER
CORRECTIVE ACTION PROPOSED



Sign of Project Manager                                                       Sign of Project Manager
      Contractor                                                                                  Shalimar Group