Sr. No.
|
DESCRIPTION
|
REMARK /YES /NO
|
|
|
|
|
|
|
1
|
CONCRETING IS DONE IN STRIPS
|
|
2
|
FORWARD FLOWING METHOD OF
CONCRETING IS USED.
|
|
|
|
|
|
|
|
I
|
CONSTRUCTION JOINT MAKING
|
|
|
|
|
|
|
|
A
|
EMPTY CEMENT BAG FOLDED
& IT'S ENDS ARE TIED
|
|
B
|
FOLDED BAG IS LAID BELOW THE
BARS
|
|
C
|
STOPPER CHAVIS PLACED ABOVE
THE BAGS
|
|
D
|
BAG REMOVED JUST BEFORE THE
CONCRETE HARDENS
|
|
E
|
THE CONCRETE AT THE JOINT
CLEANED OF ALL LOOSE MATERIAL
|
|
F
|
POLICEMEN GROUT PLACED OVER
THE JOINT.
|
|
G
|
FRESH CONCRETE PLACED AT 300
mm FROM HARDENED CONCRETE
|
|
H
|
FRESH CONCRETE VIBRATED
TOWARDS THE JOINT
|
|
I
|
AT THE JOINT THE CONCRETE
FLOW IS
|
|
|
CROSSING THE JOINT BY 50 mm
|
|
|
|
|
|
|
|
Ii
|
BEAM STOPPER
|
|
|
|
|
|
|
|
A
|
WOODEN CHAVI COVERED WITH
EMPTY CEMENT BAG.
|
|
B
|
INSERTED IN THE BEAM WHERE
STOPPER IS DESIRED.
|
|