Engineers are always looking for excellence in construction. But they have to follow some basics before starting the mega project.

The site engineers generally concentrate much on those issues:

·     Bars which have the diameter more than 36 mm should avoid lapping.
·     The maximum chair spacing is 1.00 m (or) 1 No per 1m2.
·    Minimum 12 mm diameter needed for dowel rod.
·    12 mm diameter bar should be used in chair.
·  The longitudinal reinforcement should follow the range between 0.8 – 6 per cent of gross CS.
·    For circular column, bars would be 4 Nos and 6 Nos.
·   Slabs are important in any construction. The main bar slab (8 mm HYSD) or 10mm (plane bar), distributor should not be less than 8 mm and more than 1/8th of slab’s thickness.
·    125 mm is minimum slab thickness.
·     Concrete free fall maximum maximum 1.50 m.
·     Remember lap slice should not be used in the bar larger than 36 mm.
·     Brick water absorption should not be 15 per cent.
·     PH value of water has to be 6.
·     Brick compressive strength 3.5 N / mm2.
·     8 kg per MT is the measurement of steel reinforcement binding wire.
·     Samples for ore cutting test in the soils filling for every 100m2.

Density of Materials:
Bricks: 1600 – 1920 kg/m3
Concrete block: 1920 kg/ m3
Reinforced concrete: 2310 – 2700 kg/ m3


Cube samples required for different quantity of concrete:

Quantity of Concrete
No. of cubes required
1 – 5 m3
1 No’s
6 0 15 m3
2 No’s
16 – 30 m3
3 No’s
31 – 50 m3
4 No’s
Above 50 m3
4 + 1 No’s of addition of each 50 m3

Curing time of RCC Members for different types of cement - Super Sulphate cement: 7 days, Ordinary Portland cement OPC: 10 days and Minerals & Admixture added cement: 14 days.