S.no
|
Particulers of Item
|
Units of measurement
|
Units of Payment
|
1
|
Earthwork
|
||
1.Earthwork
in excavation
|
CUM
|
Per CUM
|
|
2.Earthwork
in filling in foundation trenches
|
CUM
|
Per CUM
|
|
3.Earth
work in filling in plinth
|
CUM
|
Per CUM
|
|
2
|
Concrete
|
||
1.Lime
concrete in foundation
|
|||
2.Cement
concrete in lintels
|
|||
3. RCC in
slab
|
|||
4.Cement
concrete or RCC in chujja, sunshade
|
|||
5.Lean
concrete in roof terracing (thickness specified)
|
SQM
|
Per SQM
|
|
6.Cement
concrete bed
|
CUM
|
Per CUM
|
|
7.Reinforced
concrete sunshade (specified width and height)
|
CUM
|
Per CUM
|
|
3
|
Damp proof
course (DPC) - thickness mentioned
|
SQM
|
Per SQM
|
4
|
Brick work
|
||
1.Brickwork
in foundation
|
CUM
|
Per CUM
|
|
2.Brickwork
in plinth
|
|||
3.Brickwork
in super structure
|
|||
4.Thin
partition walls
|
SQM
|
Per SQM
|
|
5.Brickwork
in arches
|
CUM
|
Per SQM
|
|
6.Reinforced
brickwork
|
CUM
|
Per CUM
|
|
5
|
Stone work
|
||
1.Stone
masonry
|
CUM
|
Per CUM
|
|
6
|
Wood work
|
||
1.Doors
and windows frames or chaukhats, rafters, beams
|
CUM
|
Per CUM
|
|
2.Shutters of doors and windows (thickness specified)
|
SQM
|
Per SQM
|
|
3.Doors
and windows fittings (like hinges, tower bolts, sliding bolts, handles)
|
Each
|
Per Each
|
|
7
|
Steel Work
|
||
1.Steel
reinforcement bars etc in RCC and reinforced brick work
|
Quintal
|
Per Quintal
|
|
2.Bending,
binding of steel reinforcement
|
Quintal
|
Per Quintal
|
|
3.Rivets,
bolts and nuts, anchor bolts, lewis bolts, holding down bolts
|
Quintal
|
Per Quintal
|
|
4.Iron
hold fasts
|
|||
5.Iron
railing (height and types specified)
|
|||
6.Iron grills
|
SQM
|
Per SQM
|
|
8
|
Roofing
|
||
1.RCC and
RB slab roof (excluding steel)
|
CUM
|
Per CUM
|
|
2.Lean
concrete roof over and inclusive of tiles or brick or stone slab etc
(thickness specified)
|
SQM
|
Per SQM
|
|
3.Centering
and shuttering formwork
|
SQM
|
Per SQM
|
|
4.AC Sheet
Roofing
|
SQM
|
Per SQM
|
|
9
|
Plastering,
points and finishing
|
||
1.Plastering
- cement or lime mortar (thickness and proportion specified)
|
SQM
|
Per SQM
|
|
2.Pointing
|
SQM
|
Per SQM
|
|
3.White
washing, colour washing, cement washing, (number of coats specified)
|
SQM
|
Per SQM
|
|
4.Distempering
(number of coats specified)
|
SQM
|
Per SQM
|
|
5.Painting,
varnishing (number of coats specified)
|
SQM
|
Per SQM
|
|
10
|
Flooring
|
||
1)25mm
cement concrete over 75mm lime concrete floor (including lean concrete)
|
SQM
|
Per SQM
|
|
2)25mm or
40mm cement concrete floor
|
SQM
|
Per SQM
|
|
3)Doors
and window sills (CC or cement mortar plain)
|
SQM
|
Per SQM
|
|
11
|
Rain water
pipe / plain pipe
|
RM
|
Per RM
|
12
|
Steel
wooden truss
|
Each
|
Per Each
|
13
|
Glass
panels (supply)
|
SQM
|
Per SQM
|
14
|
Fixing of
glass panels or cleaning
|
Each
|
Per Each
|
• SQM = Square meter
• CUM = Cubic meter
• RM = Running meter