Name of Items
|
% of total cost
|
|
1.
|
Labour
|
30 to 35
|
2.
|
Cost of materials
|
70 to 75
|
3.
|
Foundation upto and including
plinth
|
15 to 20
|
4.
|
Super structure
|
80 to 85
|
5.
|
Second storey
|
75 to 85 of I storey
|
6.
|
Direct and overhead cost
(a)
Direct on actual work
(b) Overhead cost due to establishment,
supervision, incidential etc.
|
85 |
7.
|
Sanitation and
electrification
|
|
(a)
Sanitary and water supply
|
7 to 9
|
|
(b)
Electric installations without fans
|
7
|
|
(c)
Electric fans
|
5
|
|
8.
|
Cost break-up different parts
(a)
Earthwork in excavation filling
|
½ to 1
|
(b)
Foundation
concreting
|
4 to 6
|
|
(c)
Damp proof course
|
1
|
|
(d)
Brick work
|
34
|
|
(e)
Roofing
|
20
|
|
(f)
Floors and Windows
|
16
|
|
(g)
Plastering and pointing
|
10
|
|
(h) White & colour washing, painting
|
2
|
|
(i)
Miscellaneous
|
4
|
|
9.
|
Cost of material and labour:
(a)
Bricks
|
25 |
(b)
Cement
|
10
|
|
(c)
Steel bars
|
10
|
|
(d)
Timber
|
15
|
|
(e)
Lime
|
5
|
|
(f)
Labour
|
30
|
|
(g)
Miscellaneous
|
5
|
|
10.
|
Material required on plinth
area basis for single storey buildings.
|
|
(a)
Brick
|
500 Nos./Sq.m. of plinth area
|
|
(b)
Cement
|
1.5 bags/sq.m. of plinth area
|
|
(c)
Steel bars
|
12 kg/sq.m. of plinth area
|
|
(d)
Cost of bruning bricks
|
1.5 quintals/sq.m. of plinth
area
|
|
11.
|
Annual repair and maintenance
|
1 to 1/12% of capital cost of
building.
|