The technical planning involves
various projects. It is to be carried out by a competent engineer. The technical
planning starts when the administrative approval to the work is secured.
The technical planning is
undertaken with the following objectives:
- Preparation and finalization of drawings with detail specifications.
- Preparation of exact estimates.
- Fixing agency for executing the work. It is to be decided whether the work is to be carried out departmentally or through a contractor of the work is decided to be completed on contract basis, the type of contract needs to be finalized and contract documents prepared and signed.
- Planning of resources procurement.
- Checking of the resources at all the stages before starting the actual project work.
- Visualizing difficulties likely to crop up during the actual execution of the project work and preparation of the remedial actions to overcome them.