SAFETY ALERT
MONSOON PRECAUTIONS
Sr. No.
|
Checks Points
|
Remarks
| |
01
|
Open / clear all drains in and around project site.
| ||
02
|
Ensure all pits are effectively shored & ensure de-watering is done regularly.
| ||
03
|
Temporary approaches to site offices, stores, and storage yards etc. if required.
| ||
04
|
Rain protection during welding / gas cutting.
| ||
05
|
Ensure material stacking over sleepers.
| ||
06
|
Safe approaches for cranes, vehicles etc.
| ||
07
|
Restrict works at heights while carrying out erection work.
| ||
08
|
Ensure stability of scaffoldings daily before commencement of work.
| ||
09
|
Tarpaulin should be arranged to protect material at site.
| ||
10
|
Proper and safe storage arrangements for fuel / oil drums.
| ||
11
|
All PPE's and tools to be stored in a dry place.
| ||
12
|
Adequate materials for monsoon repair work etc.
| ||
13
|
Cover the gears, wire rope drums of cranes / material hoist by plastic / PVC sheets.
| ||
14
|
Antidote arrangements for poisonous insect / snake bite.
| ||
15
|
Maintain adequate medicines at the first aid center to treat the ailing persons.
| ||
16
|
Undertake repellent spray from local authority to prevent from any epidemic disease.
| ||
17
|
Inform all drivers / operators not move close to the excavated area.
| ||
18
|
Beware of slippery road condition.
| ||
19
|
Frequency of sewage collection at labor camp and at sites trips to be increased.
| ||
20
|
Rest place for workmen during rain.
| ||
21
|
Anchoring of roofs, wherever required.
|