Sr. No.
Description
Unit
Cement Consumption bags of 50kg. (Including 3% wastages)
A
CONCRETE (FOR CONVENTIONAL SITE MIXES ONLY)
1
01:03:06
Cum.
4.40
2
01:04:08
Cum.
3.39
3
01:02:04
Cum.
6.20
4
1:11/2:3
Cum.
8.00




B
MASONRY WORKS
1
4" thk. Brick Masonry in C.M. 1:6
Sqm.
0.09
2
4" thk. Brick Masonry in C.M. 1:4
Sqm.
0.13
3
6" thk. Brick Masonry in C.M. 1:5
Sqm.
0.13
4
6" thk. Brick Masonry in C.M. 1:6
Sqm.
0.11
5
9" thk. Brick Masonry in C.M. 1:5
Sqm.
0.30
6
Brick Masonry in C.M. 1:5
Cum.
1.31
7
4" Block Masonry in C.M. 1:4
Sqm.
0.12
8
6" Block Masonry in C.M. 1:4
Sqm.
0.19
9
UCR Masonry in C.M. 1:5
Cum.
1.80




C
PLASTER WORKS
1
External Plaster



1st coat 12mm thk C.M. 1:4
Sqm.
0.12

2nd coat upto 10mm thk C.M. 1:3
Sqm.
0.13
2
Internal Plaster 12mm thk C.M. 1:4
Sqm.
0.12




D
TILING/FLOORING WORKS
1
Mosaic/chequred tiles/Kotah/Marble or Granite flooring in grey cement
Sqm.
0.264
2
Marble Flooring in white cement
Sqm.
0.164
3
Ceramic/Virified Tiles
Sqm.
0.264
4
Skirting in cement paste 4" high
Rm
0.050
5
Ceramic dado/cladding on plastered surface
Sqm.
0.220
6
Ceramic dado/cladding on unplastered surface
Sqm.
0.600
7
China Mosaic in C.M. 1:4
Sqm.
0.380




E
WATERPROOFING WORKS
1
Toilet Waterproofing


a
Cleaning,grouting & 12mm thk base coat
Sqm.
0.20
b
Brickbat in 200mm sunk portion
Sqm.
0.44
c
Finish Coat
Sqm.
0.14
2
Terrace Waterproofing


a
Cleaning, grouting, base coat
Sqm.
0.11
b
Brickbat 
Sqm.
0.30
c
Finish Coat
Sqm.
0.14
3
Box Type Waterproofing


a
Cleaning surface & grouting
Sqm.
0.11
b
Bedding, Grouting slurry etc for fixing tiles
Sqm.
0.30
c
IPS
Sqm.
0.31