Sr. No.
|
Total Cumulative Quantity of Steel Received till date (M.T.)
|
Total Steel Consumed in RCC. Work (M.T.)
|
Total Steel Fabricated but not concreted
(M.T.)
|
Total Steel Erected but not concreted (M.T.)
|
Steel Lying at Steel Yard
(M.T.)
|
Steel as wastage at site (M.T.)
|
Theoretical and Actual
(M.T.)
| |||||
Tower 1
|
Level
|
Tower 2
|
Level
|
Tower 1
|
Tower 2
|
Tower 1
|
Tower 2
| |||||