Sr. No.
Total Cumulative Quantity of Steel Received till date (M.T.)
Total Steel Consumed in RCC. Work (M.T.)
Total Steel Fabricated but not concreted
(M.T.)
Total Steel Erected but not concreted (M.T.)
Steel Lying at Steel Yard
(M.T.)
Steel as wastage at site (M.T.)
Theoretical and Actual
(M.T.)
Tower 1
Level
Tower 2
Level
Tower 1
Tower 2
Tower 1
Tower 2