CHECKLIST FOR CUTTING, BENDING & FIXING OF REINFORCEMENT | 0 | 1 | 0 | 1 | |||||||||||
CHECKLIST FOR CUTTING, BENDING & FIXING OF REINFORCEMENT | |||||||||||||||
Sr. No: | |||||||||||||||
SITE : SHALIMAR ANTHURIUM | LOCATION : | DATE : | |||||||||||||
Ref. Drawing No. ________________________________________ | |||||||||||||||
Sr. No. | Job Description | YES | NO | NA | |||||||||||
1. | Is the method statement approved by client ? | ||||||||||||||
2. | Check whether Relevant drawings & specs. Are referred to ? | ||||||||||||||
3. | Is the bar bending schedule prepared ? | ||||||||||||||
4. | Is the BAR BENDING SCHEDULE approved by consultant/client ? | ||||||||||||||
5. | Check for correct CUTTING & BENDING OF BARS as per BBS | ||||||||||||||
A. | BAR DIAMETERS | ||||||||||||||
B. | SHAPES OF BARS | ||||||||||||||
C. | DIMENSIONS OF BARS | ||||||||||||||
D. | NUMBER OF BARS | ||||||||||||||
E. | IDENTIFICATION TAGS | ||||||||||||||
6. | Check for CLEANLINESS of Bars. | ||||||||||||||
7. | Check for correct FIXING OF BARS as per Construction Drawings. | ||||||||||||||
A. | RELATIVE POSITION OF BARS , SPACING OF BARS | ||||||||||||||
B. | COVERS TO REIMBURSEMENT | ||||||||||||||
C. | PROVISION OF CHAIRS, COVER BLOCKS & SPACERS | ||||||||||||||
D. | LAP LENGTHS & LOCATION OF LAPS | ||||||||||||||
1. | Check for satisfactory TYING OF R/F WITH BINDING WIRE. | ||||||||||||||
2. | Check for location of Service Conduits. | ||||||||||||||
3. | Check for READINESS of Reinforcement for RELEASE for Concreting. | ||||||||||||||
SIGN. OF SITE ENGINEER | |||||||||||||||
CORRECTIVE ACTION PROPOSED | |||||||||||||||
Sign of Project Manager Sign of Project Manager Contractor Shalimar Group |