CHECKLIST FOR DURING CONCRETING

0
1

0
1
CHECKLIST FOR DURING CONCRETING

Sr. No:




SITE : SHALIMAR ANTHURIUM
LOCATION :
DATE :
Ref. Drawing No. ________________________________________
Sr. No.
Job Description
YES
NO
NA
1.
Check for SLUMP of the Concrete being poured.Is it as specified?



2.
Is CONTINOUS FLOW of Concrete ensured?



3.
Check for TRANSPORTATION & PLACEMENT of concrete. Is it OK?



4.
Check whether VIBRATION being done till concrete packs tightly against all surfaces, reinforcements and embedments.



5.
Is BLENDING of Concrete poured in separate layers being ensured?



6.
Is Concrete consumed within the INIUTIAL SETTING TIME of cement?



7.
Check for positions of CONSTRUCTION JOINTS. Is it OK?



8.
Check for LEVELLING & FINISHING of Concrete Surface. Is it OK?



9.
QUANTITY OF CONCRETE POURED



10.
STARTING TIME OF CONCRETING



11.
COMPLETION TIME OF CONCRETING



12.
NO. OF TEST CUBES TAKEN



13.
SLUMP OF CONCRETE RECORDED



14.
CONCRETE DESPATCH SLIP NO.



                                                                                          

                                                                                          SIGN. OF SITE ENGINEER
CORRECTIVE ACTION PROPOSED