CHECKLIST AFTER CONCRETING FOR VACCUM DEWATERED FLOORING

0
1

0
1
CHECKLIST AFTER CONCRETING FOR VACCUM DEWATERED FLOORING

Sr. No:




SITE : SHALIMAR ANTHURIUM
LOCATION :
DATE :
Ref. Drawing No. ________________________________________
Sr. No.
Job Description
YES
NO
NA

CHECKLIST AFTER CONCRETING FOR VACCUM DEWATERED FLOORING

1.
Check for CURING ARRANGEMENTS



2.
Check for SURFACE FINISH. Is it acceptable?



3.
Check for FINISHED LEVEL of concrete. Is it OK?



4.
Check for DURATION OF CURING of concrete. Is it OK?



5.
Check for LOCATION OF JOINTS in concrete. Is it as per drawing?



6.
Check for JOINTS. Do they conform to specifications?



7.
Check for PREPARATION OF JOINTS. Is it acceptable?



8.
Check For SEALING OF JOINTS. Is it as specified?



9.
Check for FINISH OF JOINTS. Is it OK?


















                                                                                          

                                                                                          SIGN. OF SITE ENGINEER
CORRECTIVE ACTION PROPOSED



Sign of Project Manager                                                       Sign of Project Manager
      Contractor                                                                                  Shalimar Group