SHALIMAR GROUP | NAME OF THE DEPARTMENT : | DOCUMENT CODE NO. | |||||||||||||
EXECUTION | |||||||||||||||
NAME OF THE DOCUMENT : | PAGE NO. | TOTAL PAGES. | |||||||||||||
CHECKLIST FOR SHUTTERING & REINFORCEMENT, CONCRETING OF PLINTH BEAM | 0 | 1 | 0 | 1 | |||||||||||
CHECKLIST FOR SHUTTERING & REINFORCEMENT, CONCRETING OF PLINTH BEAM | |||||||||||||||
Sr. No: | |||||||||||||||
SITE : SHALIMAR ANTHURIUM | LOCATION : | DATE : | |||||||||||||
Ref. Drawing No. ________________________________________ | |||||||||||||||
Sr. No. | Job Description | YES | NO | NA | |||||||||||
1. | Centre line (Position of plinth beams) | ||||||||||||||
2. | Elevation feature at ground fit level if any | ||||||||||||||
3. | Level on top of Plinth beam. | ||||||||||||||
Shuttering dimensions - Length, breadth, depth & shape. | |||||||||||||||
4. | Earth compaction beneath beam, if shuttering not provided. | ||||||||||||||
5. | Stability if shuttering | ||||||||||||||
6. | Reinforcement-diameter, numbers, stirrups, bends etc. | ||||||||||||||
7. | Cover to reinforcement | ||||||||||||||
8. | Reinforcement for staircase 9provision) | ||||||||||||||
9. | PVC inserts for toilet pipes etc. | ||||||||||||||
10. | Top of stub column is rough and free from all loose material | ||||||||||||||
11. | Under-ground pipe for services. | ||||||||||||||
12. | Grade of Concrete | ||||||||||||||
13. | Working of vibrator. | ||||||||||||||
SIGN. OF SITE ENGINEER | |||||||||||||||
CORRECTIVE ACTION PROPOSED | |||||||||||||||
Sign of Project Manager Sign of Project Manager Contractor Shalimar Group |