CHECKLIST FOR SHUTTERING & CONCRETING OF FOUNDATIONS

0
1

0
1
CHECKLIST FOR SHUTTERING & CONCRETING OF FOUNDATIONS

Sr. No:




SITE : SHALIMAR ANTHURIUM
LOCATION :
DATE :
Ref. Drawing No. ________________________________________
Sr. No.
Job Description
YES
NO
NA
1.
Level of top of P.C.C.



2.
Centre line



3.
Orientation



4.
Length, breadth, diagonal of shuttering Depth of concerting i.e. D & d.



5.
Reinforcement should be cut only after understanding the depth of foundation.



6.
Reinforcement- diameter, numbers, lengths, position & spacing of jali etc.



7.
Cover of reinforcement, inserts, if any



8.
Stability of formwork



9.
Approved mix design as per grade of concrete as specified by Consultants



10.
Materials - aggregates and sand as per approved source.



11.
Approaches and proposed method of concerting (if height of pouring of concrete exceeds to 2 m supada should be provided.)



12.
Support to column reinforcement



13.
Availability of vibrator



14.
The Laping length bars above ground beam should be minimum 50 dia



15.
Cube to be taken for Concrete strength



                                                                                          

                                                                                          SIGN. OF SITE ENGINEER
CORRECTIVE ACTION PROPOSED



Sign of Project Manager                                                       Sign of Project Manager
      Contractor                                                                                  Shalimar Group