CHECKLIST FOR TILING WORK
|
0
|
1
|
0
|
1
| |||||||||||
CHECKLIST FOR TILING WORK
| |||||||||||||||
Sr. No:
| |||||||||||||||
SITE : SHALIMAR ANTHURIUM
|
LOCATION :
|
DATE :
| |||||||||||||
Ref. Drawing No. ________________________________________
| |||||||||||||||
Sr. No.
|
Job Description
|
YES
|
NO
|
NA
| |||||||||||
CHECKLIST PRIOR TO TILING
| |||||||||||||||
1.
|
Is the Method Statement approved by client?
| ||||||||||||||
2.
|
Check for CLEANLINESS OF BASE SURFACE. Is loose mortar & debris removed from the work area?
| ||||||||||||||
3.
|
Check for LEVELLING OF IRREGULARITIES on base surface.
| ||||||||||||||
4.
|
Check for COMPLETION OF PRECEDING ACTIVITIES of doors, partitions, false ceilings etc.
| ||||||||||||||
5.
|
Check for Provision of service conduits, Junction boxes etc.
| ||||||||||||||
6.
|
Is the approved pattern of laying available for reference?
| ||||||||||||||
7.
|
Is the approved sample of tiles available for reference?
| ||||||||||||||
8.
|
Are the slopes to the tiled surface finalised?
| ||||||||||||||
9.
|
Availability of tiles and other construction aids.
| ||||||||||||||
10.
|
Check for removal of defective tiles.
| ||||||||||||||
11.
|
Check for availability of Tiling masons & Construction aids.
| ||||||||||||||
CHECKLIST DURING TILING FOR FLOORS.
| |||||||||||||||
1.
|
Check for MORTAR MIX PROPORTION. Is it as specified?
| ||||||||||||||
2.
|
Check for Proper MIXING OF MORTAR.
| ||||||||||||||
3.
|
Check for THICKNESS OF MORTAR BED. Is it OK?
| ||||||||||||||
4.
|
Check for FOLLOWING during LAYING OF TILES.
| ||||||||||||||
5.
|
FIXING OVER MORTAR BED WITH CEMENT SLURRY
| ||||||||||||||
6.
|
PATTERN OF LAYING
| ||||||||||||||
7.
|
THICKNESS OF JOINTS BETWEEN TILES
| ||||||||||||||
8.
|
SLOPE
| ||||||||||||||
9.
|
TRUE LEVEL SURFACE
| ||||||||||||||
10.
|
MATCHING OF TILE JOINTS
| ||||||||||||||
11.
|
TILING AROUND DOORS, SANITARY FITTINGS, COLUMNS, PARTITIONS, ETC.
| ||||||||||||||
12.
|
FINISHING OF EDGES FOR CUT TILES.
| ||||||||||||||
CHECKLIST AFTER TILING FOR FLOORS.
| |||||||||||||||
1.
|
Check for CLEANING OF TILE JOINTS.
| ||||||||||||||
2.
|
Check for FLUSH POINTING of tile joints with white cement.
| ||||||||||||||
3.
|
Addition of Pigment to White cement, if required?
| ||||||||||||||
4.
|
Curing of Tiling for specified period.
| ||||||||||||||
5.
|
CLEANING of Tiled surface.
| ||||||||||||||
6.
|
Check for GRINDING AND POLISHING.
| ||||||||||||||
7.
|
FINAL CHECK for TRUE LEVEL SURFACE, PATTERN, SURFACE FINISH, SLOPE, ETC.
| ||||||||||||||
SIGN. OF SITE ENGINEER
| |||||||||||||||
CORRECTIVE ACTION PROPOSED
| |||||||||||||||
Sign of Project Manager Sign of Project Manager
Contractor Shalimar Group
|