SHALIMAR GROUP | NAME OF THE DEPARTMENT : | DOCUMENT CODE NO. | |||||||||||||
EXECUTION | |||||||||||||||
NAME OF THE DOCUMENT : | PAGE NO. | TOTAL PAGES. | |||||||||||||
CHECKLIST FOR EXCAVATION IN ROCK BY BLASTING | 0 | 1 | 0 | 1 | |||||||||||
CHECKLIST FOR EXCAVATION IN ROCK BY BLASTING | |||||||||||||||
Sr. No: | |||||||||||||||
SITE : SHALIMAR ANTHURIUM | LOCATION : | DATE : | |||||||||||||
Ref. Drawing No. ________________________________________ | |||||||||||||||
Sr. No. | Job Description | YES | NO | NA | |||||||||||
1. | Check whether permission in writing is obtained from client for blasting work. | ||||||||||||||
2. | TYPE OF BLASTING | ||||||||||||||
a) OPEN | |||||||||||||||
b) CONTROLLED | |||||||||||||||
3. | Check underground utilities like sewers, water pipelines, cables etc are at a safe distance from the area of blasting. | ||||||||||||||
4. | Check the distance of adjoining structure from the area of blasting. Is it safe ? (If the distance is more than 70m then obtain permission from client for OEN BLASTING) | ||||||||||||||
5. | Do blasting engineer, foreman & sub-contractor have valid license for blasting ? | ||||||||||||||
6. | Check that explosive (detonator & zelatine) are carried in the specific boxex by the explosive van, observing safety rules at site ? | ||||||||||||||
7. | Check that, explosives are stored in safe place away from working area, observing safety rules specified by Explosives commissioner. | ||||||||||||||
8. | Check that, day to day proper register is maintained for the blasting and signed by blasting expert, safety officer, client & main contractor and site in-charge. | ||||||||||||||
9. | Has the hole misfired ? | ||||||||||||||
10. | Check whether means of access and exit provided from the work area are adequate. | ||||||||||||||
11. | Check the dewatering arrangements water logged area. Is it O.K.? | ||||||||||||||
12. | Are JOINT INSPECTION RECORDS complete ? CONTROL LINES O.G.L. FOUNDATION LEVEL DEPTH OF EXCAVATION | ||||||||||||||
SIGN. OF SITE ENGINEER | |||||||||||||||
CORRECTIVE ACTION PROPOSED | |||||||||||||||
Sign of Project Manager Sign of Project Manager Contractor Shalimar Group |