CHECKLIST FOR MASONARY



PROJECT
Ref. No. 

DRAWING NO.
DATE

LOCATION

Sr.
DESCRIPTION
REMARKS
No.

     Accepted/rejected with clear reasons
1
Type of Masonary 
Laterite,clay/fly ash brick,concrete block
2
Masonary width (mm)

3
R.C.C.surfaces touching the masonary are hacked (tacha) at 1 hack per Sq. Inch & properly cleaned.

4
Wetting of bricks / stone/ concrete block before laying 

5
Farmas available for mortar proportioning

6
Tray available for mortar mixing

7
Mortar mix proportion (1:5)

8
Sand is screened

9
Mix material is used within 30 minutes.

10
Proper & Safe Scaffolding erected. 

11
No scaffolding supports to be inserted in the masonary

12
Masonary Lineout for the entire floor/room is done with a single coarse of masonary.

13
This laid coarse is checked for right angles & Dimensions.

14
Per day masonary height restricted to one meter.

15
R.C.C.(M15) band(100 mm   thick) 

16
No vertical joints allowed.

17
Joint thickness between 10-12 mm.

18
Masonary plumb on the side of which room?

19
Masonary plumb is checked.




20
Cleaning after day's work.

21
Date of masonary execution painted on the wall.

22
Actual size of openings left in the masonary.

CHECKED BY
PROJECT ENGINEER
*
Curing is to be carried out for minimum period of 7 days.
*
Further masonary plaster or gypsum to be done only after settlement period of 30 days.
*
Katka & chicken mesh after settlement period.