Methodology – Regular Ceiling
|
|||||||
A
|
Level Marking
|
||||||
1.
|
Draw the require false Ceiling Finish
line from the finish floor by using laser
line marker or water level.
|
||||||
2.
|
Transfer this line on all corners of room.
Mark a line on periphery of wall by using
chalk.
|
||||||
B
|
framing
|
||||||
1.
|
Fix the perimeter channel on the periphery of wall with suitables
fastners (600 mm c/c)
|
||||||
2.
|
Mark the position of fasteners on true slab at 1220 mm c/c both
direction.
|
||||||
3.
|
At junction of two lines; drill a hole of with help of 12mm dia.
Drill bit. Insert 12 mm dia & 38 mm long Rawl plug inside a hole.
|
||||||
4.
|
Fix the soffit cleat the Rawl plug (27x37x25mm x 1.6mm) at 1220 mm
c/c. Ensure the nut of Rawl plug is properly tighten with soffit cleat.
|
||||||
5.
|
Fix the celing angle (25x10mm) of suitable length to the soffit cleat
at 1220 mm c/c with the help of M6 Nut & bolt.
|
||||||
6.
|
Take a pipe for water level and transfer a perimeter top flange level
on to the ceiling angle. Then mark the position of intermediate channel.
|
||||||
7.
|
Fix the intermediate channel (15x45x15x0.90mm) to the flange of
ceiling angle (25mm) with M6 Nut & bolt. Ensure intermediate channel
resting on perimeter channel.
|
||||||
8.
|
Fix ceiling section (80x51x26mm) perpendicular to the intermediate
channel by using connecting clip.
|
||||||
9.
|
Ensure distance between two ceiling section should not be more than
457 mm c/c.
|
||||||
10.
|
Ensure the overlapping of ceiling section & intermediate channel
should not be less than 150 mm. Use metal to metal screws.
|
||||||
11.
|
Cross-check the level of all frame works to ensure entire frame is in
line & level.
|
||||||
C
|
Opening of services
|
||||||
1.
|
Cut the ceiling section at the location of opening like light
opening/ Ac opening/ Access panel.
|
||||||
2.
|
Ensure additional at both cutting ends by using intermediate channels
suspended from soffit.
|
||||||
3.
|
Put perimeter channel at the periphery of the opening.
|
||||||
D
|
|||||||
1.
|
Do boarding by using 6x4ft gypsum board. Ensure that the length of
board perpendicular to ceiling section (Square Joint of Board screw fix on
Ceiling Section)
|