CHECKLIST FOR COLUMN STARTER


PROJECT
Ref. No. 
LOCATION
DATE
COLUMN NO.
DRAWING NO.
Sr. no.
DESCRIPTION
REMARKS
1
Base of the starter (slab) is cleaned of all loose material

2
Starter formwork is checked for right angles & diagonals.

3
Depth of the starter is checked

4
No Stirrup at the level of filling  (Bharai) level.

5
All gaps (gabhdi) are properly sealed.

6
Concrete is machine mixed only.

7
Starter is properly vibrated.
Edge 1

Edge 2

8
After concreting starter is cleaned of all loose material, binding wires etc.
Edge 3

Edge 4

9
Starter laitance is removed.
Edge 5

Edge 6

10
Clear Cover to the main bar available along all 8 edges
Edge 7

Edge 8