COLUMN NO.
|
DATE
|
|||
Sr. no.
|
DESCRIPTION
|
REMARKS
|
||
1
|
Starter is cleaned of all
loose material if any.
|
|||
2
|
Columns with window system
is designed
|
|||
3
|
Column dimensions and right
angles checked.
|
|||
4
|
Shuttering oil is applied
|
|||
5
|
Plumb of the column is
checked
|
|||
6
|
Column formwork at the top
is in one plane.
|
|||
7
|
Column kanda is put at the
top to check cover.
|
|||
8
|
No stirrup tied between 500
mm above Bharai level.
|
|||
9
|
No stirrup tied between 40mm
below Bharai level.
|
|||
10
|
All gaps (gabhdi) have been
properly filled.
|
|||
11
|
Supra for column is ready
|
|||
12
|
Bond key inserted at column
top.
|
|||
13
|
Column laitance is removed
|
|||
14
|
Clear Cover to the main bar
available along all 8 edges
|
Edge 1
|
Edge 2
|
|
Edge 3
|
Edge 4
|
|||
Edge 5
|
Edge 6
|
|||
Edge 7
|
Edge 8
|