CHECKLIST FOR COLUMN CONCRETING



COLUMN NO. 

DATE






Sr. no.
DESCRIPTION
REMARKS


1
Starter is cleaned of all loose material if any.



2
Columns with window system is designed



3
Column dimensions and right angles checked.



4
Shuttering oil is applied



5
Plumb of the column is checked



6
Column formwork at the top is in one plane.



7
Column kanda is put at the top to check cover.



8
No stirrup tied between 500 mm above Bharai level.



9
No stirrup tied between 40mm below Bharai level.



10
All gaps (gabhdi) have been properly filled.



11
Supra for column is ready



12
Bond key inserted at column top.



13
Column laitance is removed



14
Clear Cover to the main bar available along all 8 edges
Edge 1

Edge 2


Edge 3

Edge 4


Edge 5

Edge 6


Edge 7

Edge 8