Theory:
Cement
is obtained by granding the various row material. The degree to which the
cement is drawn to smaller and smaller particals is called fineness of cement.
Finer the cement higher the rate of radiation and do faster the development of
strain. This is because finer cement offers greater surface area of particals
for hydration I.S. 269-1976 the reduce by weight of 90 micron I.S. sieve by
drying cement should not exceed 10% by the weight in case of ordinary Portland
cement (O.P.C.).
Application:
The
cement develop strain earlier and do form work can be removed earlier does
reducing cost of construction.
Items
Required:
1. 90
Micron I.S. sieve
2. Weight
balance with weight box
3. Bristule
brush 25 mm size
4. Cement
sample about 100 grams
Diagram:
Procedure:
1. 100 gm of cement sample was
taken and denoted by w1.
2. The sample was placed on
I.S. sieve no. 9
3. Airset lump in the sample
was taken fingers.
4. Sieve was held on the both
the hand and sieve with a gentally rise with out spilling the cement and
keeping cement will spread on the screen carried out circular motion of sieve
of the period of 15 min.
5. The reduce left on the
sieve was collected and weight. The weight of reduce is denoted as w2.
Observation 1:
Weight of the cement sample w1 = 100 gm
OBS NO.
|
Weight of
cement (w1)
|
Weight of
reduce (w2)
|
% of reduce
|
Mean value
|
1
|
100 gm
|
9 gm
|
9 %
|
-
|
2
|
100 gm
|
6.5 gm
|
6.5 %
|
8.16
|
3
|
100 gm
|
9 gm
|
9 %
|
-
|
Calculation 1:
1. % of Reduce =
w2/w1 X 100
9/100 X 100
= 9 %
2. % of Reduce =
w2/w1 X 100
6.9/100 X 100
= 6.5 %
3. % of Reduce =
w2/w1 X 100
9/100 X
100
=
9 %
Mean value = 9+6.5+9/3 =
8.16 %
Observation:
1. Weight
of the cement sample w1 = 100 gm
2. Weight
of reduce cement sample w2 = 9 gm
Sample
Calculation:
Percentage
of reduce sample = w2/w1 X 100
=
9/100 x 100
=
9 %
Conclusion:
The
given sample of cement contains less than / more than 10 % by weight of
material course than 90 Micron sieve. Therefor it satisfied / does not
satisfied the criteria as satisfied by I.S.I.
Result:
The
percentage of reduce of cement sample by dry sieving 8.16 % . It is less
than 10 % by weight.