While planning various events
of a project, it is necessary that the sequence in which the project is to be
developed, is made known to everyone from the project administration to the
site worker. Once the scheduling for resources is completed, it becomes easy to
fix up the time and progress chart (Bar Chart) Later on, it also becomes to
prepare network analysis in the form of Critical Path Method (CPM) flow
diagram.
Advantages of preparing
schedules are as follows:
- Requirement of labour at different stages of construction work can be work out.
- Phased recruitment or retrenchment can be planned and prepared.
- It gives an exact idea about the working of plant equipment and machinery. As a result, no construction machinery remains idle.
- Cost control study of the project at different stages can be reviewed on the basis of expenditure.
- Programme or procurement of construction material can be prepared.
- The requirement of funds at various stages of construction can be predicted.