CHECKLIST FOR INTERNAL PAINTING
|
0
|
1
|
0
|
1
| ||||||||||||||||
CHECKLIST FOR INTERNAL PAINTING
| ||||||||||||||||||||
Sr. No:
| ||||||||||||||||||||
SITE : SHALIMAR ANTHURIUM
|
LOCATION :
|
DATE :
| ||||||||||||||||||
Ref. Drawing No. ________________________________________
| ||||||||||||||||||||
Sr. No.
|
Job Description
|
YES
|
NO
|
NA
| ||||||||||||||||
1.
|
Check Gypsum is finished properly (No Cracks,Sckraches,damaged).
| |||||||||||||||||||
2.
|
Cover all window,switch plates before commencement of paint.
| |||||||||||||||||||
3.
|
Sponge roller with / without textured depressions.
| |||||||||||||||||||
4.
|
Brushes / bristles of good quality.
| |||||||||||||||||||
5.
|
Primer, enamel, distemper, velvette whitening recommended brand name.
| |||||||||||||||||||
6.
|
Check Primer to be applied Properly.
| |||||||||||||||||||
7.
|
Patras to be non rusted & edges sharp.
| |||||||||||||||||||
8.
|
Check 1st coat lambi is applied in all area with proper finish.
| |||||||||||||||||||
9.
|
Check 2nd coat lambi is applied in all area with proper finish.
| |||||||||||||||||||
10.
|
Sand paper of specified no.
| |||||||||||||||||||
11.
|
Check after polishing primer coat with proper finish
| |||||||||||||||||||
12.
|
Check 1st coat paint is applied
| |||||||||||||||||||
13.
|
Check AC , cp & Sanitary fittings are installed.
| |||||||||||||||||||
14.
|
Check Mellamine polish, marbale polish is completed.
| |||||||||||||||||||
15.
|
Whiting & linseed out of good quality.
| |||||||||||||||||||
16.
|
Check Final Coat is applied.
| |||||||||||||||||||
17.
|
Backing coat not visible through paint.
| |||||||||||||||||||
18.
|
Patchiness not visible over surface.
| |||||||||||||||||||
19.
|
Unevenness not observed.
| |||||||||||||||||||
20.
|
Brush marks not to be seen.
| |||||||||||||||||||
21.
|
Brush end not to remain stuck to wall.
| |||||||||||||||||||
22.
|
All corners / edges (kuch / Dhar) in line/level.
| |||||||||||||||||||
23.
|
Clean all fallen paint from floor,window switch plate etc.
| |||||||||||||||||||
SIGN. OF SITE ENGINEER
| ||||||||||||||||||||
CORRECTIVE ACTION PROPOSED
| ||||||||||||||||||||
Sign of Project Manager Sign of Project Manager
Contractor Shalimar Group
|