CHECKLIST FOR INTERNAL PAINTING

0
1

0
1
CHECKLIST FOR INTERNAL PAINTING

Sr. No:




SITE : SHALIMAR ANTHURIUM
LOCATION :
DATE :
Ref. Drawing No. ________________________________________
Sr. No.
Job Description
YES
NO
NA
1.
Check Gypsum is finished properly (No Cracks,Sckraches,damaged).



2.
Cover all window,switch plates before commencement of paint.



3.
Sponge roller with / without textured depressions.



4.
Brushes / bristles of good quality.



5.
Primer, enamel, distemper, velvette whitening recommended brand name.



6.
Check Primer to be applied Properly.



7.
Patras to be non rusted & edges sharp.



8.
Check 1st coat lambi is applied in all area with proper finish.



9.
Check 2nd coat lambi is applied in all area with proper finish.



10.
Sand paper of specified no.



11.
Check after polishing primer coat with proper finish



12.
Check 1st coat paint is applied



13.
Check AC , cp & Sanitary fittings are installed.



14.
Check Mellamine polish, marbale polish is completed.



15.
Whiting & linseed out of good quality.



16.
Check Final Coat is applied.



17.
Backing coat not visible through paint.



18.
Patchiness not visible over surface.



19.
Unevenness not observed.



20.
Brush marks not to be seen.



21.
Brush end not to remain stuck to wall.



22.
All corners / edges (kuch / Dhar) in line/level.



23.
Clean all fallen paint from floor,window switch plate etc.








                                                                                          

                                                                                                       SIGN. OF SITE ENGINEER
CORRECTIVE ACTION PROPOSED



Sign of Project Manager                                                       Sign of Project Manager
      Contractor                                                                                  Shalimar Group