SHALIMAR GROUP | NAME OF THE DEPARTMENT : | DOCUMENT CODE NO. | |||||||||||||
EXECUTION | |||||||||||||||
NAME OF THE DOCUMENT : | PAGE NO. | TOTAL PAGES. | |||||||||||||
CHECKLIST FOR BEFORE BRICK MASONARY | 0 | 1 | 0 | 1 | |||||||||||
CHECKLIST FOR BEFORE BRICK MASONARY | |||||||||||||||
Sr. No: | |||||||||||||||
SITE : SHALIMAR ANTHURIUM | LOCATION : | DATE : | |||||||||||||
Ref. Drawing No. ________________________________________ | |||||||||||||||
Sr. No. | Job Description | YES | NO | NA | |||||||||||
CHECKLIST FOR BEFORE BRICK MASONARY | |||||||||||||||
1. | Is the Method Statement Approved by client? | ||||||||||||||
2. | Is relevant drawings referred? | ||||||||||||||
3. | Check whether type and material for masonry work has been decided? | ||||||||||||||
4. | Check for availability of material as per the daily requirement? | ||||||||||||||
5. | Is area clean of loose material / concrete etc.? | ||||||||||||||
6. | Check for proper stacking of bricks / concrete blocks / rubble stone/sand / cement etc? | ||||||||||||||
7. | Check for quality of bricks/ concrete blocks / rubble / sand etc? | ||||||||||||||
8. | Check for wetting of bricks / concrete blocks? | ||||||||||||||
9. | Check whether door, window frames are ready for erection in position? | ||||||||||||||
10. | Is line out for masonry work checked? | ||||||||||||||
11. | Check for the proportion of mortar mix w.r.t. specifications? | ||||||||||||||
12. | Check whether screened sand is to be used? | ||||||||||||||
SIGN. OF SITE ENGINEER | |||||||||||||||
CORRECTIVE ACTION PROPOSED | |||||||||||||||
Sign of Project Manager Sign of Project Manager Contractor Shalimar Group |