SHALIMAR GROUP | NAME OF THE DEPARTMENT : | DOCUMENT CODE NO. | |||||||||||||
EXECUTION | |||||||||||||||
NAME OF THE DOCUMENT : | PAGE NO. | TOTAL PAGES. | |||||||||||||
CHECKLIST FOR ALLUMINIUM WINDOW | 0 | 1 | 0 | 1 | |||||||||||
CHECKLIST FOR ALLUMINIUM WINDOW | |||||||||||||||
Sr. No: | |||||||||||||||
SITE : SHALIMAR ANTHURIUM | LOCATION : | DATE : | |||||||||||||
Ref. Drawing No. ________________________________________ | |||||||||||||||
Sr. No. | Job Description | YES | NO | NA | |||||||||||
1. | Marble sill position. | ||||||||||||||
2. | Line and level of marble sill. | ||||||||||||||
3. | Size of appearing to be confirmed. | ||||||||||||||
4. | Thickness of marble sill. | ||||||||||||||
5. | Marble sill curing. | ||||||||||||||
6. | Material used is of recommended gauge. | ||||||||||||||
7. | Wt/m of section is checked. | ||||||||||||||
8. | 2/3/4 track is placed as per requirements. | ||||||||||||||
9. | Powder coating / anodising done for all sections, fittings, screws and accessories. | ||||||||||||||
10. | Diagonals to be checked. | ||||||||||||||
11. | Check quality of accessories. | ||||||||||||||
12. | Spring lock is functioning properly. | ||||||||||||||
13. | Water drainage provision in bottom track available. | ||||||||||||||
14. | All holes made to conceal screws to be rubber plugged & paint touched. | ||||||||||||||
15. | Japan make bearing to be used. | ||||||||||||||
16. | Check Anodisim. | ||||||||||||||
17. | Weights if Alu. Section is to be checked. | ||||||||||||||
18. | Thickness of fload glass is to be checked. | ||||||||||||||
19. | Gather section checked to drain water. | ||||||||||||||
20. | Locks to be checked. | ||||||||||||||
21. | Silicon sealeand shall be provided on all four sides. | ||||||||||||||
22. | PVC or Epidum gaskets used for fixing glass. | ||||||||||||||
23. | Polysulphide filling is gto be done in junction of bottom track with side track. | ||||||||||||||
SIGN. OF SITE ENGINEER | |||||||||||||||
CORRECTIVE ACTION PROPOSED | |||||||||||||||
Sign of Project Manager Sign of Project Manager Contractor Shalimar Group |