SHALIMAR GROUP | NAME OF THE DEPARTMENT : | DOCUMENT CODE NO. | |||||||||||||
EXECUTION | |||||||||||||||
NAME OF THE DOCUMENT : | PAGE NO. | TOTAL PAGES. | |||||||||||||
CHECKLIST FOR EXTERNAL PAINTING | 0 | 1 | 0 | 1 | |||||||||||
CHECKLIST FOR EXTERNAL PAINTING | |||||||||||||||
Sr. No: | |||||||||||||||
SITE : SHALIMAR ANTHURIUM | LOCATION : | DATE : | |||||||||||||
Ref. Drawing No. ________________________________________ | |||||||||||||||
Sr. No. | Job Description | YES | NO | NA | |||||||||||
A | Scaffolding | ||||||||||||||
1. | The Scaffolding to be self-standing and rigd- | ||||||||||||||
2. | Check for double horizontials, wherever necessary | ||||||||||||||
3. | Check for telescopic vertical scaffolds. | ||||||||||||||
4. | Check for diagonal bracings. | ||||||||||||||
B | Surface Preparation | ||||||||||||||
1. | Algae affected area is cleaned properly before comencing the painting work. | ||||||||||||||
2. | Crack filling is done by good quality of exterior grade crack filler | ||||||||||||||
3. | Windows frames tie be protected and wrapped with plastic sheets. | ||||||||||||||
4. | The surface should be cleared properly before comencing the painting work | ||||||||||||||
5. | Check all window jambs are properly repaired | ||||||||||||||
6. | Check deck ceilling light points are cleared | ||||||||||||||
7. | Check all deck / planters are repaired | ||||||||||||||
C. | Painting ( Primer + 2 Coat Paint ) | ||||||||||||||
1. | Check Approved Paint. | ||||||||||||||
2. | Check surface free from dust and greece | ||||||||||||||
3. | Apply 1st caot after drying period of primer | ||||||||||||||
4. | Check undulation if any | ||||||||||||||
5. | Check 2nd coat after check of 1st coat. | ||||||||||||||
6. | Paint as per approved scheme | ||||||||||||||
SIGN. OF SITE ENGINEER | |||||||||||||||
CORRECTIVE ACTION PROPOSED | |||||||||||||||
Sign of Project Manager Sign of Project Manager Contractor Shalimar Group |