SHALIMAR GROUP | NAME OF THE DEPARTMENT : | DOCUMENT CODE NO. | |||||||||||||
EXECUTION | |||||||||||||||
NAME OF THE DOCUMENT : | PAGE NO. | TOTAL PAGES. | |||||||||||||
CHECKLIST FOR STRUCTURAL STEEL FABRICATION | 0 | 1 | 0 | 1 | |||||||||||
CHECKLIST FOR STRUCTURAL STEEL FABRICATION | |||||||||||||||
Sr. No: | |||||||||||||||
SITE : SHALIMAR ANTHURIUM | LOCATION : | DATE : | |||||||||||||
Ref. Drawing No. ________________________________________ | |||||||||||||||
Sr. No. | Job Description | YES | NO | NA | |||||||||||
1. | Check for Avalibility of APPROVED SHOP DRAWINGS FOR FABRICATION. | ||||||||||||||
2. | Check for Avalibility of Structural Steel Sections, Welding Rods required for fabrication and readiness of Other construction Aids. | ||||||||||||||
3. | Check for straightening of members is it acceptable? | ||||||||||||||
4. | Check for availability of Authorised Welders for Welding operations. | ||||||||||||||
5. | Check for Dimensions of sub-assembly, is it OK ? | ||||||||||||||
6. | Check for CUTTING of the sections is it as specfied ? | ||||||||||||||
7. | Check for LAYOUT OF SUB-ASSEMBLY is it OK ? | ||||||||||||||
8. | Check for LAYOUT FOR FINAL ASSEMBLY is it OK ? | ||||||||||||||
9. | Check for JOINT PREPARATION, is it OK ? | ||||||||||||||
10. | Check for WELD QUALITY & THICKNESS, Is it as specified ? | ||||||||||||||
11. | Check for SURFACE PREPARATION prior to Painting. | ||||||||||||||
12. | Check for PAINTING as per Specifications. Is it OK ? | ||||||||||||||
13. | Check for Lifting 7 Transportation Arrangements prior to Erection. | ||||||||||||||
14. | Check for COMPLETION OF JOINT RECORDS FOR INSPECTION. | ||||||||||||||
SIGN. OF SITE ENGINEER | |||||||||||||||
CORRECTIVE ACTION PROPOSED | |||||||||||||||
Sign of Project Manager Sign of Project Manager Contractor Shalimar Group |