SHALIMAR GROUP | NAME OF THE DEPARTMENT : | DOCUMENT CODE NO. | |||||||||||||
EXECUTION | |||||||||||||||
NAME OF THE DOCUMENT : | PAGE NO. | TOTAL PAGES. | |||||||||||||
CHECKLIST FOR FIXING DOORS & WINDOWS | 0 | 1 | 0 | 1 | |||||||||||
CHECKLIST FOR FIXING DOORS & WINDOWS | |||||||||||||||
Sr. No: | |||||||||||||||
SITE : SHALIMAR ANTHURIUM | LOCATION : | DATE : | |||||||||||||
Ref. Drawing No. ________________________________________ | |||||||||||||||
Sr. No. | Job Description | YES | NO | NA | |||||||||||
A | Scaffolding | ||||||||||||||
1. | Check for relevant drawings and specifications? | ||||||||||||||
2. | Check whether material is approved by clients / consultants? | ||||||||||||||
3. | Check for GROUTING OF VERTICAL MEMBERS of the Door Frames into the Floor. | ||||||||||||||
4. | Check for grouting of holdfasts into wall? | ||||||||||||||
5. | Check for PLUMB for the Door Frame w.r.t. Masonry Opening. | ||||||||||||||
6. | Check for FASTENING OF DOOR FRAMES to Walls by Screws. | ||||||||||||||
7. | Check for the PROVISION & PROPER FUNCTIONING of the following. | ||||||||||||||
A. | JOINTING CLEATS | ||||||||||||||
B. | PIVOTS | ||||||||||||||
C. | DOOR CLOSERS | ||||||||||||||
D. | FLOOR SPRINGS | ||||||||||||||
E. | BOLTS | ||||||||||||||
F. | LOCKS | ||||||||||||||
G. | WEATHER STRIPPING | ||||||||||||||
H. | GLAZING BEADS | ||||||||||||||
I. | EPDM RUBBER GASKETS | ||||||||||||||
J. | HANDLES | ||||||||||||||
K. | HINGES | ||||||||||||||
L. | PEG STAYS | ||||||||||||||
M. | FLY PROOF MESH | ||||||||||||||
N. | OTHERS | ||||||||||||||
8. | FINAL CHECK for PAINT, SURFACE FINISH, GLAZING. | ||||||||||||||
9. | Check whether Doors / Windows / Fixtures are acceptance to clients /consultants. | ||||||||||||||
10. | Check for Removal of Protective Coating & CLEANING of the Aluminium door before Handing Over. | ||||||||||||||
SIGN. OF SITE ENGINEER | |||||||||||||||
CORRECTIVE ACTION PROPOSED | |||||||||||||||
Sign of Project Manager Sign of Project Manager Contractor Shalimar Group |