SHALIMAR GROUP | NAME OF THE DEPARTMENT : | DOCUMENT CODE NO. | |||||||||||||
EXECUTION | |||||||||||||||
NAME OF THE DOCUMENT : | PAGE NO. | TOTAL PAGES. | |||||||||||||
CHECKLIST FOR EXTERNAL PLASTER | 0 | 1 | 0 | 1 | |||||||||||
CHECKLIST FOR EXTERNAL PLASTER | |||||||||||||||
Sr. No: | |||||||||||||||
SITE : SHALIMAR ANTHURIUM | LOCATION : | DATE : | |||||||||||||
Ref. Drawing No. ________________________________________ | |||||||||||||||
Sr. No. | Job Description | YES | NO | NA | |||||||||||
1. | All concrete & masonry surface are in line & plumb | ||||||||||||||
2. | Hacking of all R.C.C. surfaces | ||||||||||||||
3. | All mortar to be mixed in mixer, material measured in boxes and water cement ratio maintained at 0.7 | ||||||||||||||
4. | The scaffolding self-standing and rigid window frames have been protected and wrapped with plastic sheets | ||||||||||||||
5. | Thickness level marks have been made at a distance of 4 M c/c. plaster thickness is not more than20 mm. | ||||||||||||||
6. | The thickness marks to be make in two layers of 12 mm and 8 mm | ||||||||||||||
7. | Masonary has been pre-wetted 24 hours in advance | ||||||||||||||
8. | Metal is fixed in cm at the junction of masonary & RCC surface | ||||||||||||||
9. | Keep 3, 4 day gap between 1st coat and 2nd coat for double coat plaster | ||||||||||||||
10. | Finish scaffolding holes properly & immediately | ||||||||||||||
11. | Vertically of window opening jams as well as horizontally of its bottom sill and top to be checked during plaster | ||||||||||||||
12. | For parapet wall leave plaster for 40 cm for water proffing purpose. | ||||||||||||||
13. | Clean the terrace above plaster work | ||||||||||||||
14. | Cure the plaster for 15 days | ||||||||||||||
15. | Plaster should be checked for its thickness line, level and plumb | ||||||||||||||
SIGN. OF SITE ENGINEER | |||||||||||||||
CORRECTIVE ACTION PROPOSED | |||||||||||||||
Sign of Project Manager Sign of Project Manager Contractor Shalimar Group |