| SHALIMAR GROUP | NAME OF THE DEPARTMENT : | DOCUMENT CODE NO. | |||||||||||||
| EXECUTION | | | | | | | |||||||||
| NAME OF THE DOCUMENT : | PAGE NO. | TOTAL PAGES. | |||||||||||||
| CHECKLIST FOR PIPING LAYOUT CONCEALED | | 0 | 1 | | 0 | 1 | |||||||||
| CHECKLIST FOR PIPING LAYOUT CONCEALED | |||||||||||||||
| | Sr. No: | | | | | ||||||||||
| SITE : SHALIMAR ANTHURIUM | LOCATION : | DATE : | |||||||||||||
| Ref. Drawing No. ________________________________________ | |||||||||||||||
| Sr. No. | Job Description | YES | NO | NA | |||||||||||
| 1. | All supply points : ('O' of pipes, points to be in proper location with proper projection. | | | | |||||||||||
| 2. | Master stop-cock. | | | | |||||||||||
| 3. | Divertor. | | | | |||||||||||
| 4. | Spout | | | | |||||||||||
| 5. | Basin mixer-hot and cold | | | | |||||||||||
| 6. | Shower | | | | |||||||||||
| 7. | Heater-supply and delivery pipes. | | | | |||||||||||
| 8. | Washing m/c-supply. | | | | |||||||||||
| 9. | Washing m/c-drain. | | | | |||||||||||
| 10. | Flush | | | | |||||||||||
| 11. | Jet System. | | | | |||||||||||
| 12. | Plugging all open points of item | | | | |||||||||||
| 13. | Pressure testing of all pipes in item | | | | |||||||||||
| 14. | Test pressure (double the working head notless than 50 psi) | | | | |||||||||||
| | During Process | | | | |||||||||||
| 1. | Mortor mixed to proper ratio. | | | | |||||||||||
| 2. | No Bricks are used to fill gaps. | | | | |||||||||||
| 3. | Mortor filled to be in line level with plaster. | | | | |||||||||||
| 4. | Curing is done for 7 days. | | | | |||||||||||
| 5. | Expanded mortor 200mm wide to be fixed over plumbing pipe. | | | | |||||||||||
| 6. | All concealed pipes to be properly covered with bitumenious paints & hessian cloths. | | | | |||||||||||
| | | | | | |||||||||||
| SIGN. OF SITE ENGINEER | |||||||||||||||
| CORRECTIVE ACTION PROPOSED | |||||||||||||||
| Sign of Project Manager Sign of Project Manager Contractor Shalimar Group | |||||||||||||||