CHECKLIST FOR STRUCTURAL STEEL ERECTION | 0 | 1 | 0 | 1 | |||||||||||
CHECKLIST FOR STRUCTURAL STEEL ERECTION | |||||||||||||||
Sr. No: | |||||||||||||||
SITE : SHALIMAR ANTHURIUM | LOCATION : | DATE : | |||||||||||||
Ref. Drawing No. ________________________________________ | |||||||||||||||
Sr. No. | Job Description | YES | NO | NA | |||||||||||
1. | Check for Availibility of APPROVED SHOP DRAWINGS FOR ERECTION. | ||||||||||||||
2. | Check for Availibility of Fabricated Material at the Erection Site. Also check for HARD PUNCH MARK on the structural elements. | ||||||||||||||
3. | Check for REDINESS of the site for Structural Erection, i.e. COMPLETION OF PRECEDING ACTIVITIES (EX. DIMENSIONS OF FOUNDATION BOLTS IN TWO SUCCESSIVE COLUMNS) | ||||||||||||||
4. | Check for PROVISION & WORKING CONDITION OF ERECTION AIDS. Check for the condition of slings 7 deshackles. Are they fit for use ? | ||||||||||||||
5. | Check for ERECTION as per erection seQUENCE is it being followed ? | ||||||||||||||
6. | Check for Bracing of the structures during Erection. Is it satisfactory ? Check for Provision of nut Bolts. | ||||||||||||||
7. | Check for ALIGNMENT, LEVELS, location,ORIENTATION, etc. | ||||||||||||||
8. | Check for field wELDING Is it as specified ? | ||||||||||||||
9. | Check for Tying of safety nets and use of safety appliances. | ||||||||||||||
10. | Check for painting as per specifications | ||||||||||||||
11. | Check for COMPLETION OF JOINT RECORDS FOR INSPECTION. | ||||||||||||||
SIGN. OF SITE ENGINEER | |||||||||||||||
CORRECTIVE ACTION PROPOSED | |||||||||||||||
Sign of Project Manager Sign of Project Manager Contractor Shalimar Group |