• Study the electrical drawings for the positions of various points,D.B. (distribution box) etc.

  • Fix the location of D.B. (distribution box), ensuring that it cannot be seen while entering the flat and is not visible from living room.

  • Provide the conduits for mains, light circuits TV and telephone as per the approved drawings.

  • Prepare actual layout of the conduiting in slab for bill preparation and record purposes.

  • Check the centre of the fan hook, box diagonally, for centre alignment, considering the loft position in room.

  • Check the locations of all the points.

  • Bonding solution should be applied to all the pipes and accessories to avoid loose fixing of pipes with accessories.

  • Tie the conduits, using binding wire, to each other and to the slab steel.

  • Provide suitable inspection boxes to permit periodical inspection and to facilitate removal of wires, if necessary.

  • Ensure that conduits do not get damaged with the movement of the labourers on the slab.

  • Ensure that the fan box entries/holes are intact to prevent the cement slurry from entering.