This test method sets out the procedure for the determination for the insitu dry density of compacted soils, gravels and crushed rock materials in earth works and pavement layers by the sand replacement method using a sand pouring cone. This test is generally limited to materials with a maximum particle size of 5cm

AIM 


To determine the in-situ dry density of soil by sand replacement method as per IS: 2720 (Part XXVIII) – 1974. 



APPARATUS



i) Sand-pouring cylinder conforming to IS: 2720 (Part XXVIII) –1974 

ii) Cylindrical calibrating container conforming to IS: 2720 (PartXXVIII) - 1974 

iii) Soil cutting and excavating tools such as a scraper tool,bent spoon 

iv) Glass plate - 450mm square and 9mm thick or larger 

v) Metal containers to collect excavated soil 

vi) Metal tray - 300mm square and 40mm deep with a 100mm hole in the centre 

vii) Balance, with an accuracy of 1gm 





PROCEDURE 


A. Calibration of apparatus 


a) The method given below should be followed for the determination of the weight of sand in the cone of the pouring cylinder: 

i) The pouring cylinder should be filled so that the level of the sand in the cylinder is within about 10mm of the top. Its total initial weight (W1) should be maintained constant throughout the tests for which the calibration is used. A volume of sand equivalent to that of the excavated hole in the soil (or equal to that of the calibrating container) should be allowed to runout of the cylinder under gravity. The shutter of the pouring cylinder should then be closed and the cylinder placed on a plain surface, such as a glass plate. 

ii) The shutter of the pouring cylinder should be opened and sand allowed to runout. When no further movement of sand takes place in the cylinder, the shutter should be closed and the cylinder removed carefully. 

iii) The sand that had filled the cone of the pouring cylinder (that is, the sand that is left on the plain surface) should be collected and weighed to the nearest gram. 

iv) These measurements should be repeated at least thrice and the mean weight (W2) taken. 


b) The method described below should be followed for the determination of the bulk density of the sand ( γs ) 


i) The internal volume (V) in ml of the calibrating container should be determined from the weight of water contained in the container when filled to the brim. The volume may also be calculated from the measured internal dimensions of the container. 


ii) The pouring cylinder should be placed concentrically on the top of the calibrating container after being filled to the constant weight (W1) as in Para a) i), above. The shutter of the pouring cylinder should be closed during the operation. The shutter should be opened and sand allowed to runout. When no further movement of sand takes place in the cylinder, the shutter should be closed. The pouring cylinder should be removed and weighed to the nearest gram. 

iii) These measurements should be repeated at least thrice and the mean weight (W3) taken. 

B. Measurement of soil density 

The following method should be followed for the measurement of soil density: 

i) A flat area, approximately 450sq.mm of the soil to be tested should be exposed and trimmed down to a level surface, preferably with the aid of the scraper tool. 

ii) The metal tray with a central hole should be laid on the prepared surface of the soil with the hole over the portion of the soil to be tested. The hole in the soil should then be excavated using the hole in the tray as a pattern, to the depth of the layer to be tested upto a maximum of 150mm. The excavated soil should be carefully collected, leaving no loose material in the hole and weighed to the nearest gram(Ww). The metal tray should be removed before the pouring cylinder is placed in position over the excavated hole. 

iii) The water content (w) of the excavated soil should be determined by the method specified in Para 5.1. Alternatively, the whole of the excavated soil should be dried and weighed (Wd). 

iv) The pouring cylinder, filled to the constant weight (W1) as above, should be so placed that the base of the cylinder covers the hole concentrically. The shutter shoul then be opened and sand allowed to runout into the hole. The pouring cylinder and the surrounding area should not be vibrated during this period. When no further movement of sand takes place, the shutter should be closed. The cylinder should be removed and weighed to the nearest gram (W4). 



CALCULATIONS 


i) The weight of sand (Wa) in gram, required to fill the calibrating container should be calculated from the formula: 

Wa = W1 – W3 – W2 

ii) The bulk density of the sand (γs) in kg/m3 should be calculated from the formula: 
γs = V/Wa×1000 

ii) The weight of sand (Wb) in gram, required to fill the excavated hole should be calculated from the formula: 
Wb = W1 – W4 – W2 

iv) The bulk density (γb), that is, the weight of the wet soil per cubic meter should be calculated from the formula: 
γd=Ww/Wb×γs Kg/m3 

v) The dry density (γd), that is, the weight of dry soil per cubic meter should be calculated from the formula:
γd=100γb/(100+w) Kg/m3 
γd=Wd/Wb×γs Kg/m3 



REPORTING OF RESULTS 


The following values should be reported: 


i) dry density of soil in kg/m3 to the nearest whole number; also to be calculated and reported in g/cc correct to the second place of decimal 

ii) water content of the soil in percent reported to two significant figures. 

A sample proforma for the record of the test results is given below..