Sr. No.
|
Field Test Details
|
Required Results
|
Actual Results
|
Remarks
|
01
|
Type of shutter
|
Pull and push type
|
As per actual
|
Documentary Evidence of implementation of Field Test System not Available and shall be Implemented immediately.
|
02
|
Check whether C.R.C.A. or H.R.C.A. sheet used for laths
|
Should be as per purchase order
|
As per actual
| |
03
|
Gauges of bottom lock plate and loading arrangement
|
Should be as per purchase
|
As per actual
| |
04
|
Type of section used for laths with gauge
|
16 / 18 / 20 gauge or should be as per purchase order
|
As per actual
| |
05
|
Check shutter laths with gauge
|
4 to 4 No or as per drawings
|
As per actual
| |
06
|
Top cover in one piece with centrally supported plate and it gauge
|
In one piece of 20 / 22/ 24 gauge or as per order
|
As per actual
| |
07
|
Diameter of ball bearing and spring with their No.
|
Check No. and size as per order
|
As per actual
| |
08
|
M.S. pipe shaft diameter
|
Generally 40 mm of gauge or as per order
|
As per actual
| |
09
|
Bracket Plates and guide rail
|
As per order
|
As per actual
| |
10
|
Stoppers on each side
|
As per order
|
As per actual
| |
11
|
Handle
|
2 Nos. riveted or as per order
|
As per actual
| |
12
|
Hold fast at equal distant
|
30 cm in length and 3 Nos. on each side or as per order
|
As per actual
| |
13
|
Red oxide
|
Uniform one coat
|
As per actual
| |
14
|
Extra locking arrangement
|
1 No. in central or as per order
|
As per actual
| |
15
|
Overall finishing / fixing / locking operation
|
Should be neat and proper
|
As per actual
| |
16
|
All fittings, fixtures etc.
|
In right angle, in line and level
|
As per actual
| |
17
|
Greasing for spring and guide rails
|
Should be sufficient for smooth operation
|
As per actual
|